Please choose your delivery location

The selection of the country/region page can influence various factors such as price, shipping options and product availability.
Contact
igus® Ltd.

Caswell Road

Northampton, NN4 7PW

01604 677240

drylin W installation instructions


During the installation process, a compressive force of minimum 50N is recommended on the centre of the mounting surface. Alternatively, a plastic hammer/soft face hammer can be used during and after the mounting to align the bearing.
 
Tightening torque:
W-06: M4 = 1.5Nm
W-10: M6 = 6.0Nm
W-16: M8 = 15.0Nm
W-20: M8 = 15.0Nm

Installation instructions for drylin® W rail: with pillow block or complete carriage

Tightening order of the screws Tightening order of the screws
Tightening order of the screws Tightening sequence of the screws