We offer you various tools to simplify opening and closing our e-chains. Our chain openers for the E2/000 series enable you to open a one-metre e-chain within two seconds (it took 33 seconds previously).
▼Cost down
▼Cost down
▼Cost down
Normally, machine tool manufacturers try to avoid situations where too many different work steps have to be carried out on a system at the same time. A lot of manual work done by different employees does not necessarily enhance efficiency; on the contrary, it increases the probability that errors can occur. By using igus readychains, all four e-chains from igus can be fully installed in half a day. Previously, two employees took one and half weeks for the work on the X axis of an AERO system and a further week for the energy supply of the Y and Z axes. In this way, Hartford is able to cut out some work steps, reduce process cost and, at the same time, greatly improve productivity.
Tech up, Cost down with energy chain systems