Change Language :
For this gigantic crane for shipbuilding, the manufacturer opted for a special design: 16 crane trolleys move along travels of between 72 and 77 metres. This division of labour means that there are fewer cables per trolley, allowing a space-saving arrangement on the crane girder.
Here you can find the products used

rol e-chain 4040RHDB

Office hours
Monday to Friday from 8 am - 8 pm.
Live chat:
24h